Expo 2010 Shanghai Hellenic Pavilion Audiovisual Systems
Client:
Hellenic Republic
Solution:
Audiovisual
Industry:
Museums & Cultural Centers
Country:
China
Project Summary
In 2010, Telmaco designed, supplied, installed, and commissioned the complete audiovisual system for the 2,000 m² Hellenic Pavilion at World Expo Shanghai. The installation combined 21 HD projection systems (rear and front), synchronized media servers for multi-screen playback, immersive multi-channel audio, a seamless 16-cube LCD video wall, and interactive VR applications—all orchestrated via a central show control platform.
2,000 m²
Pavilion Area
21
HD Projectors
16
LCD Cubes (video wall)
2010
Completion Year
Overview
The pavilion required a reliable, high-impact multimedia environment to present Greek culture to a global audience. Telmaco delivered a tightly synchronized AV ecosystem: large-format projection, distributed displays, a seamless video wall, and responsive show control that unified audio, video, and lighting. Interactive VR stations added hands-on educational experiences, increasing visitor engagement and dwell time.
The Challenge
Delivering a high-impact, fully synchronized multimedia experience across a large pavilion.
Unifying projections, LCDs, and a seamless video wall.
Coordinating 35 HD video outputs and 80 audio outputs.
Single show control for AV and lighting timelines.
Designing VR stations for educational use at scale.
The Solution
An advanced, centrally controlled AV environment with interactive components.
Projection Systems
21 HD projectors in rear/front configurations for large-scale visuals.
Video Wall
Seamless 16-cube LCD wall for high-brightness feature content.
Distributed Displays
15 LCD screens for auxiliary media and wayfinding.
Media Servers
Synchronized playback with 35 HD video and 80 audio outputs.
Show Control
Central platform orchestrating AV and lighting cues.
Interactive VR
3 VR applications for pedagogical, hands-on exploration.
Tailored Services
21 HD projection systems and 15 LCD displays.
Multi-zone audio with synchronized servers (80 outputs).
Central show-control for video, audio, and lighting sync.
Seamless LCD videowall (16 cubes) and full on-site integration.
Multi-touch/interactive stations and visitor engagement.
Media playback/graphics pipeline for synchronized visuals (35 HD outputs).